
Deye 20 kW 3-phase + 2 × SE-F16-C 32 kWh
Three-phase hybrid inverter Deye SUN-20K-SG05LP3-EU-SM2 20 kW + 2 × Deye SE-F16-C low-voltage LiFePO₄ batteries, 16 kWh each (32 kWh)
- 20 kW
- 32 kWh
- 3 phases

Three-phase hybrid inverter Fox ESS P3-Pro-20.0 20 kW + Fox ESS CQ7 high-voltage battery: 1 × CQ7-M and 7 × CQ7-S (56.16 kWh)
| Power | 20 kW |
|---|---|
| Phases | 3 phases |
| Capacity | 56.16 kWh (rated, 8 × 7.02) |
| Battery voltage | 150–800 V |
Prices are indicative, excluding VAT; the final cost with delivery, installation and commissioning is stated in the commercial proposal.
| Kit contents | Fox ESS P3-Pro-20.0 inverter × 1; CQ7-M master module (with BMS) × 1; CQ7-S slave module × 7 |
|---|---|
| Inverter | Fox ESS P3-Pro-20.0 |
| Rated inverter power | 20 kW |
| Phases | 3 |
| Inverter type | Hybrid, for high-voltage batteries |
| Battery voltage range | 150–800 V |
| Inverter battery inputs | 2 independent, 50 A each |
| Battery | Fox ESS CQ7: LiFePO₄ modules 57.6 V / 7.02 kWh (EU version) |
| Battery type | LiFePO₄, high-voltage (HV) |
| Number of battery modules | 8: 1 × CQ7-M + 7 × CQ7-S |
| Battery configuration | 1 CQ7-L8 stack (8 modules, 460.8 V nominal) |
| Battery capacity | 56.16 kWh (rated, 8 × 7.02) |
| Battery power | up to 20 kW per the Fox ESS CQ7 compatibility table (one stack) |
| Scalability | Up to 14 modules per stack (Fox ESS data) |
| Not included in the price | Battery-to-inverter cables, switchgear and protection in the distribution board, solar panels, installation, setup and delivery |

Three-phase hybrid inverter Deye SUN-20K-SG05LP3-EU-SM2 20 kW + 2 × Deye SE-F16-C low-voltage LiFePO₄ batteries, 16 kWh each (32 kWh)

Three-phase hybrid inverter Deye SUN-20K-SG05LP3-EU-SM2 20 kW + 3 × Deye SE-F16-C low-voltage LiFePO₄ batteries, 16 kWh each (48 kWh)

Three-phase hybrid inverter Deye SUN-20K-SG01HP3-EU-AM2 20 kW + Deye BOS-G high-voltage battery: 12 × BOS-GM5.1 (61.44 kWh), 1 × HVB750V/100A-EU, 1 × 3U-HRACK
Leave your contacts, load and objective. We will refine the configuration and prepare a proposal.
Before the proposal we do: