
P-100 / 261 kWh
Small and medium business
*Price excl. VAT, EXW Gorlice, Poland
Choose converter power and battery capacity separately. The final system configuration is agreed for your project.

Small and medium business
*Price excl. VAT, EXW Gorlice, Poland

Small and medium business
*Price excl. VAT, EXW Gorlice, Poland

Medium and large business
*Price excl. VAT, EXW Gorlice, Poland

Medium and large business
*Price excl. VAT, EXW Gorlice, Poland

Medium and large business

Large enterprises and infrastructure
*Price excl. VAT, EXW Gorlice, Poland

Large enterprises and infrastructure
Manufacturer prices as of 05.11.2025 in EUR excl. VAT, EXW Gorlice (Poland). Delivery, installation and commissioning are quoted in the proposal.
The table helps you quickly see the differences between models and choose a direction for a consultation.
| Model | Power | Capacity | Site scale | Main scenario | ESS price* | |
|---|---|---|---|---|---|---|
| P-100 / 261 | 100 kVA | 261 kWh | Small and medium business | Backup, peak shaving, solar | €54,389 | Details → |
| P-200 / 522 | 200 kVA | 522 kWh | Small and medium business | Backup for production lines, solar storage | €113,893 | Details → |
| P-300 / 783 | 300 kVA | 783 kWh | Medium and large business | Continuous processes, refrigeration, peak load | €152,103 | Details → |
| P-400 / 1044 | 400 kVA | 1044 kWh | Medium and large business | Microgrid with generator and solar | €190,762 | Details → |
| P-500 / 1306 | 500 kVA | 1306 kWh | Medium and large business | Price arbitrage, peak load, grid services | Price on request | Details → |
| P-1000 / 2089 | 1000 kVA | 2089 kWh | Large enterprises and infrastructure | Energy projects, large plants, energy trading | €332,750 | Details → |
| P-1000 / 2403 | 1000 kVA | 2403 kWh | Large enterprises and infrastructure | Ancillary services market, industrial parks | Price on request | Details → |
Showing 7 of 7 models
*Price excl. VAT, EXW Gorlice, Poland
The choice depends on more than power. What matters is the site’s consumption, critical loads, the backup time you need, existing solar or a generator, and the use case.
What must run at the same time sets the PCS power.
How many hours of backup sets the battery capacity.
Affects the microgrid design and charging modes.
Hourly data shows the peaks and the economic effect.
Send a request and we will select a BESS for your site, loads and business goals.
All configurations from the manufacturer’s price list. Need a different power and capacity combination? We will configure it for your site.
| SOLA Titan ESS model | ESS price* | With isolation transformer* |
|---|---|---|
| P-100 kVA / 261 kWh | €54,389 | €60,748 |
| P-125 kVA / 261 kWh | €58,745 | €65,103 |
| P-200 kVA / 522 kWh | €113,893 | €126,031 |
| P-250 kVA / 522 kWh | €122,424 | €134,562 |
| P-200 kVA / 783 kWh | €139,765 | €151,903 |
| P-250 kVA / 783 kWh | €148,297 | €160,435 |
| P-300 kVA / 783 kWh | €152,103 | €168,720 |
| P-375 kVA / 783 kWh | €161,245 | €178,361 |
| P-200 kVA / 1044 kWh | €163,944 | €176,082 |
| P-250 kVA / 1044 kWh | €172,055 | €184,193 |
| P-400 kVA / 1044 kWh | €190,762 | €210,909 |
| P-500 kVA / 1044 kWh | €198,627 | €220,323 |
| P-1000 kVA / 2089 kWh | €332,750 | €379,119 |
| P-1000 kVA / 2507 kWh | €371,993 | €418,363 |
| P-1200 kVA / 2507 kWh | €389,517 | €439,887 |
Manufacturer prices as of 05.11.2025 in EUR excl. VAT, EXW Gorlice (Poland). Delivery, installation and commissioning are quoted in the proposal.
Price list · PDF (Ukrainian)Charge in cheap hours, supply in expensive hours, backup during outages — estimate the payback in a minute.
SOLA is the manufacturer, so the system can be tailored to the customer’s needs.
The number of battery modules and PCS rating match your load profile, for example a P-500 with 1044 or 2089 kWh.
Anti-corrosion coatings for chemical plants and additional options for hazardous (Ex) areas.
Upgrade to SCADA Advance: day-ahead market, FCR, generation and load control, integration with your infrastructure via IEC / DNP3.
Leave your contacts, load and objective. We will refine the configuration and prepare a proposal.
Before the proposal we do: