SOLA ENERGYRequest a proposal
Industry

Industrial battery energy storage and solar plants for factories

Backup for production lines, peak shaving and operation on the electricity market: we design and build BESS and solar plants for industrial and energy sites.

What a BESS does

01

Backup and continuity

Critical processes and lines keep running through outages and voltage dips.

02

Peak shaving

The battery covers peak demand and lowers the required connection capacity.

03

Day-ahead / intraday arbitrage

Charging in cheap hours and discharging in expensive ones, on hourly market prices.

04

PV and genset integration

Daytime solar surplus moved to the evening; a genset as a backup source.

05

Ancillary services

Frequency regulation for systems that operate on the market.

SOLA TITAN

SOLA TITAN models

The P-100 cabinet and P-200 – P-1000 containers. Manufacturer prices in euros excluding VAT.

SOLA TITAN P-100 / 261
TITAN · L

P-100 / 261 kWh

100 kVALFPDanfoss PCS

Small and medium business

ESS price*€54,389
With isolation transformer*€60,748

*Price excl. VAT, EXW Gorlice, Poland

Specifications
SOLA TITAN P-200 / 522
TITAN · CL

P-200 / 522 kWh

200 kVALFPDanfoss PCS

Small and medium business

ESS price*€113,893
With isolation transformer*€126,031

*Price excl. VAT, EXW Gorlice, Poland

Specifications
SOLA TITAN P-300 / 783
TITAN · CL

P-300 / 783 kWh

300 kVALFPDanfoss PCS

Medium and large business

ESS price*€152,103
With isolation transformer*€168,720

*Price excl. VAT, EXW Gorlice, Poland

Specifications
SOLA TITAN P-400 / 1044
TITAN · CL

P-400 / 1044 kWh

400 kVALFPDanfoss PCS

Medium and large business

ESS price*€190,762
With isolation transformer*€210,909

*Price excl. VAT, EXW Gorlice, Poland

Specifications
SOLA TITAN P-1000 / 2089
TITAN · CL

P-1000 / 2089 kWh

1000 kVALFPDanfoss PCS

Large enterprises and infrastructure

ESS price*€332,750
With isolation transformer*€379,119

*Price excl. VAT, EXW Gorlice, Poland

Specifications

Projects above 2.4 MWh

For investors, solar and wind farms and energy companies we select megawatt-scale container solutions for the grid connection terms and operating mode.

Get an estimate
SOLA TITAN container installed at a substation
SOLA TITAN on site

Why choose SOLA TITAN

  1. 01

    A microgrid with many sources

    One system controls the grid, solar, wind turbines, gas and diesel generators and prioritised loads from a single console. Most BESS can add only one generator or one solar plant.

  2. 02

    No interruption

    Most systems take 1–2 minutes to switch over, which means downtime and risk to equipment. SOLA TITAN runs in parallel with the grid: when it fails, loads keep their supply without any pause.

  3. 03

    EU-grade cybersecurity

    The EMS is developed in the EU and exchanges data only with servers located in the EU. A hardware crypto chip, IEC 62443 certification and protection against software tampering.

  4. 04

    Automatic market operation

    The Siemens EMS buys and sells energy on the day-ahead and intraday markets within set parameters and takes part in frequency balancing (FCR).

  5. 05

    VdS-certified fire protection

    Aerosol in every module and nitrogen in the container. According to the manufacturer, it is the only system of its class in Europe with VdS certification, which lowers insurance costs. Powder systems contaminate all equipment.

  6. 06

    Cooling and heating

    A propylene glycol loop keeps the batteries at +25 ± 2 °C all year round, in frost and heat, even when the system is idle.

Learn more →
How to choose

How to tell which BESS your business needs

The choice depends on more than power. What matters is the site’s consumption, critical loads, the backup time you need, existing solar or a generator, and the use case.

01

Power of critical equipment

What must run at the same time sets the PCS power.

02

Required backup time

How many hours of backup sets the battery capacity.

03

Solar plant or generator

Affects the microgrid design and charging modes.

04

Load profile

Hourly data shows the peaks and the economic effect.

Not sure which model is right for you?

Send a request and we will select a BESS for your site, loads and business goals.

Find the right BESS
How we work

Full cycle, one accountable team

SOLA ENERGY runs your project from the first call to service. We select equipment for the task, not for a single brand.

  1. 01Project manager

    Request and support

    We take on your objective, manage the project and remain your contact until the work is done.

  2. 02Engineers

    Analysis and design

    Load analysis, calculations, design of solar plants, storage and backup power.

  3. 03Supply

    Equipment

    SOLA TITAN, Deye, Fox ESS and other manufacturers, with official warranty.

  4. 04Installation crews

    Installation

    Installation to common designs, quality standards and acceptance procedures.

  5. 05Service team

    Commissioning and service

    Commissioning, EMS set-up, acceptance and ongoing support.

How much can a BESS save at your site?

Charge in cheap hours, supply in expensive hours, backup during outages — estimate the payback in a minute.

Calculate payback

Questions before design

Is a transformer required?

Yes. The converter output voltage is 690 V. For a 400 V grid a Δ/Y isolation transformer to EN 60076-11 is used. We select it as part of the project.

How long will the backup last?

It depends on the average load, usable capacity, reserve state of charge and losses. The kWh / kW ratio is only a theoretical guide; we calculate it precisely from your load profile.

Can solar and a generator be connected?

Yes. SOLA TITAN works with the grid, solar and wind plants, gas turbines and diesel generators and synchronises them with each other.

Which parts are made in China?

Only the LFP cells (Hithium). Inverters are Danfoss (Vacon, Finland), control and fire automation are Siemens, the BMS is IFS Polska, and design and assembly take place in Poland.

Can the battery earn money on the market?

Yes. With SCADA Advance the system automatically buys and sells energy on the day-ahead and intraday markets, takes part in FCR and works with distribution and transmission system operators.

What is the payback?

It depends on the load profile and prices. In the manufacturer’s calculation for a P-500 with 1044 and 2089 kWh, payback including 5% inflation was 4.7 and 4.2 years. We will run a separate calculation for your site.

How is the price formed?

The website price is indicative. The final proposal covers the PCS version, transformer, protection, logistics, installation and commissioning.

Is a BESS right for every business?

It pays off most where there are critical processes, peak loads, an on-site solar plant or an unstable grid. For other sites we assess feasibility from the load profile before proposing equipment.

What determines the BESS power?

The equipment that must run at the same time, including inrush currents. Capacity is chosen separately for the backup time and use case: backup, peak shaving or solar.

Which sites suit SOLA TITAN?

Factories, warehouses and logistics centres, retail and office buildings, hospitals, schools, water utilities and energy projects. We define the parameters after analysing consumption and grid connection conditions.

SOLA ENERGY

Let’s discuss your energy project.

Leave your contacts, load and objective. We will refine the configuration and prepare a proposal.

Before the proposal we do:

  • Load analysis
  • Power sizing
  • Solar integration
  • Preliminary calculation
+38 067 401 00 94info@solaenergy.com.uaMessage us on Viber