
Power100 kWCapacity215 kWh
Deye MS-GS215-2H3
All-in-one energy storage system 100 kW / 215 kWh with 200 kW PV input
- 100 kW
- 215 kWh
- PV 200 kW
UAH 2,047,500excl. VAT≈ $43,564Request a quote

100 kW / 241 kWh commercial energy storage system
| Power | 100 kW |
|---|---|
| Phases | 3 phases |
| Capacity | 241 kWh |
| Max. PV power | 200 kW |
| Number of MPPTs | 8 |
| Backup power (EPS) | 110 kVA |
| Battery voltage | 672–876 V |
| Max. charge / discharge current | 190 / 190 A |
| Max. efficiency | 98.0% |
| Dimensions | 1040 × 2230 × 1500 mm |
| Weight | <2600 kg |
| Enclosure protection | IP55 |
Prices are indicative, excluding VAT; the final cost with delivery, installation and commissioning is stated in the commercial proposal.
| Parameter | Value |
|---|---|
| Model | TM241kWh-100kW-H |
| System type | Commercial energy storage system (ESS) |
| Battery capacity | 241 kWh |
| Battery type | LiFePO4 (LFP) |
| Cell type | 3.2 V / 314 Ah |
| Capacity of one battery module | 60.29 kWh |
| Battery operating voltage range | 672–876 V |
| Maximum charge/discharge current | 190 / 190 A |
| Battery module protection rating | IP67 |
| Maximum PV power | 200 kW |
| Maximum PV input voltage | 1000 V |
| MPPT operating range | 180–850 V |
| MPPT full-load voltage range | 370–850 V |
| Number of MPPTs | 8 |
| Number of strings | 16 (2 per MPPT) |
| Rated AC power | 100 kW |
| Maximum output power | 110 kVA |
| Maximum AC input power | 207 kVA |
| Maximum battery charging power | 100 kW |
| Maximum bypass current | 300 A |
| Backup output (EPS) | 110 kVA |
| EPS peak power (10 s) | 155 kVA |
| Switchover time | <10 ms |
| Maximum efficiency | 98.0% |
| Charge/discharge round-trip efficiency | 89.5% |
| Communications | Ethernet, 4G |
| Cooling type | Liquid |
| Operating temperature | -25…+55°C |
| Operating altitude | ≤3000 m |
| Humidity | 0–100% |
| Noise level | <75 dB |
| Depth of discharge (DoD) | 0–100% |
| Cycle count | ≥8000 |
| Ingress protection | IP55 |
| Corrosion protection | C4 (C5 optional) |
| Dimensions | 1040 × 2230 × 1500 mm |
| Weight | <2600 kg |
| Diesel generator compatibility | Yes |
| Maximum number of parallel systems | 25 (on-grid mode), 10 (off-grid mode) |

All-in-one energy storage system 100 kW / 215 kWh with 200 kW PV input

Commercial BESS: 80 kW hybrid inverter and 15 batteries of 16.06 kWh each

Commercial BESS: 125 kW hybrid inverter and 15 batteries of 16.06 kWh each
Leave your contacts, load and objective. We will refine the configuration and prepare a proposal.
Before the proposal we do: